Friday, January 11, 2008

From Office Suite to Chapel


Our new chapel was remodeled from an office suite. Upper left is the completed chapel from the doorway. Each of the successive shots are from the same doorway. Center top is the space with a wall dividing the suite. The upper right is after the wall was removed. The bottom row shows one step before completion, day before first services, and zuhoyo at the blessing of water first services January 6, 2008. Mission members volunteered their time for the remodeling. The "Remodeling Team" included: Christopher, Cienna, Haben, Fr. John-Brian, Mulu, Rachele, Robb, and Teresa Kochamma. (photos by TBP/JBP)






Posted by Picasa

  • Holy Transfiguration Publications: books by Fr John Brian
  • 0 Comments:

    Post a Comment

    << Home